Public Meeting Notice for Replacement of Grove Street Bridge over Salisbury Plain River and Intersection Improvements at Lyman/Grove/Summer Streets in Brockton 

A Virtual Design Public Hearing will be hosted on the MassDOT website to present the design for the proposed Grove Street bridge replacement and intersection improvements to the Grove Street, Lyman Street and Summer Street intersection in Brockton, MA. The meeting will take place on Wednesday, August 5, 2026, at 5:00 PM. 

The purpose of this hearing is to provide the public with the opportunity to become fully acquainted with the proposed project. All views and comments submitted in response to the hearing will be reviewed and considered to the maximum extent possible.  

The proposed project includes full replacement of the Grove Street bridge over the Salisbury Plain River. The intersection improvements at Grove Street, Lyman Street, and Summer Street will include replacement of traffic signals, reconstructed pavement, ADA-compliant pedestrian facilities, and bicycle accommodations. Funding for construction of this project is included in FFY 2027 of the Old Colony Transportation Improvement Program (TIP). 

Access to the public meeting can be found on the MassDOT Highway Division website, as well as specific meeting materials. The meeting will be recorded and available once processed. 